BOM basic elements
- BOM line types
- Item: Item stocked in inventory
- Phantom: Assembled item not stocked in inventory however when needed manufactured. example Concrete is not in stock always if needed then manufactured
- Pegged supply: Item which requires dedicated sub-production for each production order
- Vendor: Component is provided by vendor